Installing the new mesh flooring.
On Monday, 14th January 2013, with the help of Chris Roberts, the floor underneath the old bell pits was removed and replaced with grill mesh. This is to allow the sound of the new bells to pass through the floor of the old bell chamber and then out through the louvres.
Click on any thumbnail to enlarge the pictures.